Owner: Hello Fresh
Hello Fresh needed major assistance with tenant improvements within its food processing plant that was made up of a warehouse and office section within the building. As an existing building, it presented some challenges regarding the thousands of square feet of excavation, back fill and trench compaction required before plumbing could be installed. This project involved the planning and installation of a complete sanitary waste and vent system as well as replacing fixtures in the building, tying in the existing waste and vent piping to the new piping. Along with piping, we were responsible for installing the hot and cold water systems and corresponding fixtures and furnishing overhead compressed air piping and drop downs to 100 locations.