Because the conditions of any work environment affect everything from productivity to culture, the need for an HVAC system to work as expected cannot be overstated. Our approach to HVAC systems is rooted in a continuum of safety, quality and productivity. To ensure our customers benefit from our specialized process, we persistently utilize local dispatching, adhere to schedules as agreed upon with our customers, execute follow up calls after every installation to gain feedback and implement third-party surveys.

Cameron County Administration Building

Cameron County Administration Building

At the Administration Building for Cameron County, we were part of a design-build retrofit of the eight-story building. Included in the solution was the installation of two 250-ton air-cooled chillers, four new air handlers, new ductwork, a... Read More >

Harlingen Border Patrol

Harlingen Border Patrol

In partnering with the Border Patrol in Harlingen, Texas, our teams lifted and reinstalled all roof-mounted HVAC equipment to allow for the reroofing of the entire facility. Installation and fabrication of ductwork with windstorm-rated curb... Read More >

Brownsville International Airport

Brownsville International Airport

At the Brownsville International Airport, we were part of the team that completed the installation of the HVAC System for the new 92,000-square-foot Airport Terminal and Customs and Border Protection building. Our scope included prefabricat... Read More >

University of Texas RGV Vivarium

University of Texas RGV Vivarium

This project included the installation of new mechanical systems which included ductwork and underground piping that tied into the existing central plant piping loop. Our scope included adding a redundant air-cooled chiller and boiler to sa... Read More >

Texas State Technical College

Texas State Technical College

We have completed multiple projects at Texas State Technical College, serving the customer's needs of retrofitting and improving the efficiencies and effectiveness of their mechanical systems. One of the projects completed was the installat... Read More >

Brownsville ISD (BISD) Aquatic Center

Brownsville ISD (BISD) Aquatic Center

At the Aquatic Center for Brownsville ISD, our team completed a retrofit of the existing mechanical systems serving the interior space of the building and pool's heating system. Our solution addressed the owner's concerns of improving the s... Read More >

La Joya ISD – Palmview HS

La Joya ISD – Palmview HS

In partnering with La Joya ISD and Palmview High School, our team retrofitted three cooling towers serving the chilled water system. The utilization of 3D scanning and BIM enhanced our Pre-Construction approach and installation measures sin... Read More >

Harlingen ISD – Early College HS

Harlingen ISD – Early College HS

At the Early College High School for Harlingen ISD, we installed a new HVAC infrastructure for a 50,000-square-foot campus. Included in the infrastructure installation was a Central Plant inclusive of (2) 150 ton air-cooled chillers, pumps,... Read More >

Tropical Texas Behavioral Health

Tropical Texas Behavioral Health

At Tropical Texas Behavioral Health, we installed a variable refrigerant flow system, including all the associated ductwork and refrigerant piping. The system included more than 50 mechanical components, 350 diffusers, in-ceiling cases and... Read More >

McAllen Medical Center

McAllen Medical Center

We partnered with McAllen Medical Center to provide a solution for the failing equipment that was at the end of its useful life. Our solution was a multiyear project in a fully-functioning hospital, collaborating with staff and management f... Read More >

Rio Grande Regional Hospital

Rio Grande Regional Hospital

At Rio Grande Regional Hospital, our team completed a replacement and retrofit of chilled water air handlers serving both the second and third floors. The large custom air handler fed both floors, and new duct work was installed on the seco... Read More >

Texas Regional Bank HQ

Texas Regional Bank HQ

At Texas Regional Bank Headquarters, we were part of the design-build team installing a dual path chilled water cooling system with variable air volume control and electric reheat system. Our scope included providing and installing two chil... Read More >

Boeing

Boeing

Boeing is a 20+ year relationship serving them in many facets, from Service to Installation and from mechanical and plumbing to controls.  Our teams have completed hundreds of jobs that include building new facilities by installing multiple... Read More >