At the Administration Building for Cameron County, we were part of a design-build retrofit of the eight-story building. Included in the solution was the installation of two 250-ton air-cooled chillers, four new air handlers, new ductwork, and steel piping systems to the second floor mechanical room with VAV boxes and an upgraded controls system.