La Joya ISD – Palmview HS

In partnering with La Joya ISD and Palmview High School, our team retrofitted three cooling towers serving the chilled water system. The utilization of 3D scanning and BIM enhanced our Pre-Construction approach and installation measures since we were able to prefabricate the polymer piping system. These measures assisted in minimizing downtime for the owner and provided for a streamlined installation schedule. During the installation process, part of our turn-key solution was to provide 400 tons of temporary cooling to keep the classrooms operational, with zero downtime for the school.