Controls
As part of our complete approach to every project, we integrate an assortment of intelligent systems to precisely optimize how a building performs. Within the most dynamic work environments, we install the highest grade, best-in-class equipment to solve the most demanding problems – for the life of that structure. Knowing that buildings are only as intelligent and safe as their controls, we install elegantly designed building automation, and smart access control and video systems to improve the level of security for every occupant.
Projects
Cameron County Administration Building
At the Administration Building for Cameron County, we were part of a design-build retrofit of the eight-story building. Included in the solution was the installation of two 250-ton air-cooled chillers, four new air handlers, new ductwork, a...
Brownsville International Airport
At the Brownsville International Airport, we were part of the team that completed the installation of the HVAC System for the new 92,000-square-foot Airport Terminal and Customs and Border Protection building. Our scope included prefabricat...
Texas State Technical College
We have completed multiple projects at Texas State Technical College, serving the customer's needs of retrofitting and improving the efficiencies and effectiveness of their mechanical systems. One of the projects completed was the installat...
Brownsville ISD (BISD) Aquatic Center
At the Aquatic Center for Brownsville ISD, our team completed a retrofit of the existing mechanical systems serving the interior space of the building and pool's heating system. Our solution addressed the owner's concerns of improving the s...
Harlingen ISD – Early College HS
At the Early College High School for Harlingen ISD, we installed a new HVAC infrastructure for a 50,000-square-foot campus. Included in the infrastructure installation was a Central Plant inclusive of (2) 150 ton air-cooled chillers, pumps,...
McAllen Medical Center
We partnered with McAllen Medical Center to provide a solution for the failing equipment that was at the end of its useful life. Our solution was a multiyear project in a fully-functioning hospital, collaborating with staff and management f...
Rio Grande Regional Hospital
At Rio Grande Regional Hospital, our team completed a replacement and retrofit of chilled water air handlers serving both the second and third floors. The large custom air handler fed both floors, and new duct work was installed on the seco...
Texas Regional Bank HQ
At Texas Regional Bank Headquarters, we were part of the design-build team installing a dual path chilled water cooling system with variable air volume control and electric reheat system. Our scope included providing and installing two chil...
Boeing
Boeing is a 20+ year relationship serving them in many facets, from Service to Installation and from mechanical and plumbing to controls. Our teams have completed hundreds of jobs that include building new facilities by installing multiple...